
Elite Screens Tripod
120", 16:9

Elite Screens Tripod
120", 16:9
Hello, the screen has a fragile design. Its size makes it difficult to move. One of the screen cloth suspension parts broke after the first few uses. We do not recommend this product.
yes, that's exactly how it is.
This screen is explicitly connected to the tripod, and is also fixed to it. With a little tinkering, the screen can be separated from the tripod; however, fixing it to the ceiling then requires a creation from the DIY workshop. In addition, the screen sits in the box with a return spring, so that the screen rolls in by itself if it is not sufficiently taut. That means if you want it to hang down, you'd have to put some (properly sized) weight on it. All in all, that would be a botch-up.
https://www.elitescreens.ch/downloads/stativleinwand-tripod-gebrauchsanweisung.pdf https://www.elitescreens.ch/downloads/stativleinwand-tripod-abmessungen.pdf When folded, the dimensions should be approximately as follows: 224 x 15 x 15 cm, 7.8 kg A cover is not included in the delivery. The screen has an integrated/built-in carrying handle.
Unfortunately yes, according to our supplier the current expected delivery time is 3+ months (no guarantee).
Yes can also be mounted without a tripod!
No cover unfortunately, just the original cardboard packaging with a foam tip ( or two? ) to protect the ends. Also a very good screen!
That's quite possible - I used the screen outdoors several times during the World Cup/EM. Of course, always without rain and getting wet, but I think that will hardly be the case.
Yes, the tripod is included.
The canvas is opaque.
Many thanks for the tip! The link should now work again.
Unfortunately, the screen cannot be separated from the stand.
The tripod is made of metal
Yes, this canvas is black on the back.
We always try to hand over orders placed before 17:00 to the post office on the same evening. Unfortunately, we cannot influence whether the post office can then deliver the goods within one or two days. However, there can always be delays over public holidays.
18 of 18 questions